ENA Connect Direct integration for all LCT
Streamline DNO applications for heat pumps, EV chargers, solar panels and battery storage. Direct ENA Connect Direct integration saves 10+ hours weekly for renewable energy installers.
Comprehensive LCT DNO applications through ENA Connect Direct
Handle DNO applications for heat pumps, EV chargers, solar installations and battery storage through our integrated ENA Connect Direct platform. ºÚÁϳԹÏÍø connects directly with ENA Connect Direct to manage application workflows for all low carbon technology projects.
- Heat pump applications via streamlined EV & HP process with automated load calculations
- EV charger applications via streamlined EV & HP process with specification management
- G98 applications for solar installations under 11kW with automated capacity calculations
- G99 applications for larger solar and battery systems with technical validation
- Direct integration with all six UK Distribution Network Operators
Direct ENA Connect Direct integration for all low carbon technologies
Direct integration with ENA Connect Direct enables seamless application submission across all six UK DNOs. The system handles technical requirements, form population, and submission tracking for heat pumps, EV chargers, solar panels and battery storage installations.
- Pre-populate application forms using your project data across all LCT types
- Check technical requirements and thresholds before submission for each technology
- Submit applications to all UK Distribution Network Operators through unified workflows
- Organise technical specifications, site plans, and compliance certificates for all LCT
- Monitor submission status, DNO responses, and approval timelines across all technologies
Technical compliance validation for all low carbon technologies
Ensure compliance for heat pumps, EV chargers, solar panels and battery storage installations with automated checking against current ENA engineering recommendations. The system validates technical requirements for all application pathways.
- Heat pump systems validated for electrical load requirements and EV & HP process compliance
- EV charger installations assessed for capacity thresholds and load management requirements
- Solar installation capacity checked against G98 (under 11kW) and G99 (over 11kW) thresholds
- Battery storage systems validated for capacity thresholds and technical specifications
- Verify equipment protection configurations meet DNO technical standards across all LCT
Streamlined approval process for all low carbon technology projects
Accelerate project delivery with faster DNO approvals for heat pumps, EV chargers, solar panels and battery storage installations. Reduce application processing times and eliminate manual paperwork through automated submission workflows.
- Pre-validation ensures all LCT applications meet technical requirements before submission
- Automated status tracking provides real-time updates on application progress
- Digital document management eliminates paperwork for all installation compliance
- Integrated project timelines account for DNO approval requirements across all technologies
- Cut application completion time from hours to minutes for all LCT types
Comprehensive support: ºÚÁϳԹÏÍø integrates with ENA Connect Direct to handle DNO applications for heat pumps, EV chargers, solar panels and battery storage installations.
Business workflow management: We enhance ENA Connect Direct with comprehensive project tracking and team coordination across all low carbon technologies.
Not ready to try yet?
Keep up to date with our latest developments